This site uses cookies, by
continuing to use this site you are agreeing to their use.
Learn
More
thames barrier & crossness
In June 2007, HELC went by
coach to the Thames Barrier and were shown round one of the towers.
More
trips with an engineering dimension can be found under the button
Click on the thumbnails for a larger image; return by
clicking |
|
on the top left of the screen |
The Barrier from the bank |
Crane |
Hydraulic piston for moving the
barriers. The wrapping is to stop the steel from going rusty.
The whole area was spotless.
|
The Engineers' Lunch Club
|
Towards the opposite bank of the
Thames |
|
crossness
pumping station |
Manchester boiler without plate |
A Pre-war bathroom |
A collection of loos |
Victorian splendour |
|
HELC members |
Beam engine |
Bearing on the end of the beam
another view on the right |
|
Restored pillar |
Hub and protected stairwell |
Pump to lift the sewage |
Spiral staircase to floor below |